Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1460.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

May 17, 2022     Left wingtip bottom hinge - (4 hours)       Category: Wings
Decided to install a hinge on the bottom of the left wingtip that will hopefully be somewhat more secure than the right. Used my rivet fan to lay out holes in between the ones already in the bottom of the wing. Match drilled the wider -4 half of the hinge to the wing, then drilled out the additional holes once the hinge half was secure with clecoes. Removed the hinge half and installed it into the left bottom wingtip and match drilled the additional holes to the wingtip. Marked the centerline of the narrower -3 hinge half and used the -4 hinge half once again to mark the -3 half for rivet holes.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.